New houses keep going up in Elkhorn and Valley, around Arlington and on the edges of Fremont, and nearly every one of them comes with a contract that has a line for cabinets in it. The home builder priced that line to the cabinets its supplier carries. Some owners look at the kitchen they have in mind, look at that line, and start asking whether a local shop could build the cabinets instead.
Usually it can. Whether it makes sense is settled by what that one contract line holds and what the builder gives back for it, well before anyone opens a door sample. The second question, and the easiest one to skip, is who stands behind the cabinets once the builder hands over the keys.
Can you use your own cabinet shop when you are building a new house?
Usually, yes. Many home builders will let an owner supply the cabinets, and the contract decides how. The common route is crediting the cabinet allowance back and having a shop that builds custom cabinets in Fremont make them instead. Some builders allow it for the kitchen only, and a few will not allow it at all. Ask before the contract is signed, not at the selections meeting.
Before signing, owner-supplied cabinets are one item in a negotiation, and the builder can price the change into the deal. After signing, the allowance is already part of the contract price and the builder’s supplier may already have the house on its schedule, so the same request becomes a change order the builder can decline or charge for.
A builder that says no usually has a reason. Its warranty and its schedule both assume its own cabinets and its own installer, and an outside shop in the middle of the job adds a party to coordinate. Some builders keep a written policy for owner-supplied items, and a copy of it answers most of these questions up front.
What does a builder’s cabinet allowance usually cover?
An allowance is a dollar placeholder. The home builder set it to what the stock or semi-custom line from its own supplier costs for a house that size, and what sits inside the figure changes from one builder to the next. Read what the line includes before comparing it with anything else.
Depending on the builder, the allowance may or may not carry:
- the boxes and doors themselves
- the installer’s labor
- knobs and pulls
- crown, light rail and finished end panels
- the bathroom vanities, and sometimes the tops on them
A line that includes install and the vanities is a bigger number than one that covers kitchen boxes and doors alone, and two allowances of the same size can buy very different amounts of house. Countertops often sit on a separate allowance line, so a credit on the cabinets may say nothing about the tops.
The allowance also tells you which tier of cabinet the builder had in mind. If the difference between a stock line, a semi-custom catalog and a shop-built kitchen is still fuzzy, the guide on what separates stock, semi-custom and custom cabinets sorts them out.
How does the credit for the allowance work, and what comes off it?
When an owner supplies the cabinets, the builder credits the allowance back against the contract price, or credits a figure below it. The gap has a reason. The builder’s supplier discount and its installer’s labor were folded into that line, and some builders also add a handling or coordination charge on any owner-supplied work. Get the credit amount in writing before a cabinet shop prices the job.
Once the credit is on paper, one piece of arithmetic tells you a lot. Take the share of the allowance meant for the kitchen and divide it by the kitchen’s linear feet of cabinetry, measured along the wall with uppers and lowers counted together. Then set that per-foot figure against the installed ranges. Stock runs about $60-$200 a linear foot, semi-custom $150-$650, and custom $500-$1,200. Where the allowance lands shows which line the builder priced to, and how far below the custom range it sits. The cost page lays out what custom cabinetry costs per linear foot and what pushes a kitchen up or down inside that range.
An allowance that leaves out install reads low against installed prices. And when one line covers the kitchen and every bath with no split, divide by the linear feet across all those rooms.
Who is responsible for the cabinets after the builder hands over the keys?
The builder’s warranty covers what the builder supplied. Cabinets the owner brought in sit outside it, so the cabinet shop stands behind its own boxes, doors, finish and install. The exact split is whatever the builder’s contract says about owner-supplied items, so read that part of it before signing and keep a copy with the cabinet shop’s estimate.
That split matters most in the first year. A new house is full of water when the owners move in. Framing lumber, drywall mud, paint and a basement slab all give it up slowly, and the first Nebraska heating season pulls most of it out in a few months of dry furnace air. Studs shrink a little as they dry. Drywall moves with them, and a nail pop or a cracked corner at a seam is normal in a house’s first winter.
Cabinets fastened to those walls feel it. A door that closed even in October can sit a hair proud by February and need a hinge adjustment. A scribe line that met the wall tight can open a thin gap where a drywall seam moved behind it. A mitered crown joint can open the width of a business card. None of that is a defect in the cabinets, and none of it is the builder’s to fix when the builder did not supply them. That return visit belongs to the cabinet shop. At the estimate, ask whether the shop schedules that visit after the first winter or comes out when called.
Damage from other trades is the other gray area, and the one that causes the arguments. In a new house the cabinets go in while the job is still busy. The countertop crew templates and sets stone on top of them, the plumber cuts the sink base for supply lines and a drain, an electrician may run under-cabinet lights, and the painter touches up the walls beside them. A chipped door edge or a sink base floor cut wider than it needed to be came from somebody, and three weeks later nobody remembers who.
A written sign-off at install settles it. When the shop finishes hanging the cabinets, the owner or the builder’s superintendent walks them with the installer, notes anything that needs attention, and signs that the cabinets were accepted as installed. Damage found after that date points at the trades that worked on the cabinets next, and the builder, who schedules those trades, is the one to raise it with. Without the sign-off, the cabinet shop and the builder’s subs can each say it was fine when they left.
When does the cabinet shop need to be part of the conversation?
Before the builder’s selections deadline. A custom kitchen takes six to ten weeks from final measure to installed cabinets, and the builder’s schedule will not hold the house open waiting on it. An owner who brings the shop in after the builder has started ordering is asking the whole job to slow down.
Early does not mean the shop needs the house built. It can draw and price the kitchen from the builder’s plan set, which puts its number next to the credit while the decision is still open. The final measure is taken later, in the built rooms.
Which rooms are worth taking out of the builder’s cabinet package?
Most owners who go this route spend the credit on the kitchen first, and the island with it. Those are the cabinets used hardest, and the ones most likely to want a layout the supplier’s catalog does not offer. After that comes the main-bath vanity, then a mudroom or drop-zone wall by the garage door if the plan has one.
The laundry room and a secondary bath can stay on the builder’s line when the layout is ordinary. A straight run of uppers over a washer and dryer, or a single vanity in a hall bath, is where a stock box does its job and the credit stretches further spent elsewhere. Splitting the package this way depends on the builder crediting room by room, which is one more thing to get in writing.
For the kitchen itself, the page on custom kitchen cabinets covers what the shop builds there.
When is the builder’s cabinet package the right call?
Sometimes the honest answer is to take the builder’s cabinets. A spec house already under way has its cabinets ordered, and pulling them out of a running job costs more than it saves. A closing date that cannot move, tied to the sale of the old house or the end of a lease, leaves no room for a custom kitchen’s schedule. And plenty of buyers are happy with the line the allowance was priced to, the one they saw in the builder’s model home.
The other case is the credit itself. A builder that credits back well under the allowance, or adds a handling charge on top, leaves little to put toward the shop’s price, and the owner covers most of a custom kitchen out of pocket. When the written credit comes back that low, the builder’s package is the better spend, and a room it did not fit can still go to a cabinet shop after closing, as its own project.
Related service: Custom cabinets in Fremont